Calculating production cost: materials, labour, overhead and entries.

Production cost is what a company spent to make a product: the materials used, direct labour and the product's share of production overhead. To get the cost of one unit, add the materials consumed on the production order at their stock cost, the hours worked at the hourly rate and the overhead for the same hours, then divide the total by the quantity produced. This guide explains what the Estonian financial reporting standard allows into cost and what it keeps out, how to compare planned and actual cost, what work in progress is and which entries bring finished goods into stock.

Author: Rando Soomets

What production cost is made of.

For financial statements prepared under the Estonian financial reporting standard, inventories follow guideline RTJ 4 “Inventories” of the Accounting Standards Board. Under point 7, inventories are first recognised at cost, which consists of the purchase, production and other costs needed to bring them to their present location and condition. Point 10 adds that production costs include both direct costs, such as materials and production workers' wages, and a proportional share of production overhead.

In practice production cost has three parts. All three are collected per production order, because the production order is the document that drives the work and receives the finished goods into stock.

  • materials: raw materials, components, packaging and the normal scrap allowed in the recipe, valued at stock cost (FIFO or weighted average)
  • direct labour: the time workers spent on this product's production stages, multiplied by the cost of a working hour
  • production overhead: depreciation and repairs of production buildings and equipment, production energy and the production manager's salary, spread over products on a measurable basis, usually working hours

What stays out of production cost.

RTJ 4 point 11 lists costs that are not part of the cost of inventories. They are expenses of the period:

  • abnormal production losses
  • storage costs, unless they are unavoidable in the production process
  • non-production overheads that are not needed to bring the inventories to their present location and condition
  • selling costs

The guideline's own example draws the line: depreciation of the production building and the production manager's salary belong in cost, while depreciation of the administrative building, storage of finished goods and the sales manager's salary do not. Office rent, bookkeeping fees and advertising therefore stay in the income statement even when they are the company's largest costs.

Volume matters too. Under point 10, fixed production overhead is allocated to products on the basis of normal production capacity. When a company works below capacity, the overhead per unit does not grow: the part not allocated to products is expensed in the period. In a quiet month you should not spread the whole month's rent over the few units produced.

Calculating production cost step by step.

A planned cost, or costing, is calculated before production from the recipe and the production stages. The same method works in a spreadsheet and in software:

  • 1. Write down the recipe: the quantity of each component per unit and the normal scrap as a percentage.
  • 2. Value the materials at stock cost. If an item is not in stock, use the latest purchase price and remember that it is an estimate.
  • 3. Describe the production stages: each stage has a department, a standard time in minutes per unit and, where needed, a setup time used once per production order.
  • 4. Set the department's hourly rate: the cost of a working hour, including the employer's taxes on wages.
  • 5. Calculate the overhead rate: annual production overhead divided by the normal number of productive hours in a year.
  • 6. Add materials, labour and overhead. A stage's hours are (standard time × quantity + setup time) / 60; labour is those hours times the hourly rate and overhead is the same hours times the overhead rate. Divide the total by the quantity to be produced.

The result is the planned unit cost. The actual cost is known only when the production order is done, because only then do you know how much material was really used and how much time was logged.

Example: the cost of ten garden benches.

A small woodworking shop runs a production order for ten garden benches. Amounts are in euros, excluding VAT. Under the recipe, materials for ten benches, normal scrap included, cost 385.00 at stock cost. There are three production stages: sawing in the saw department (30 minutes of setup and 15 minutes per bench), assembly in the assembly shop (30 minutes per bench) and finishing in the same shop (12 minutes per bench). The saw department's hourly rate is 24.00 with an overhead rate of 10.00 per hour; the assembly shop's hourly rate is 22.00 with an overhead rate of 6.00 per hour.

Sawing is planned at 30 + 15 × 10 = 180 minutes, or 3 hours, assembly at 5 hours and finishing at 2 hours. Labour is 3 × 24.00 + 7 × 22.00 = 226.00 and overhead 3 × 10.00 + 7 × 6.00 = 72.00. The planned cost is 385.00 + 226.00 + 72.00 = 683.00, or 68.30 per bench.

During production one board breaks and a new one is taken from stock, so actual materials come to 402.00. Assembly takes six hours instead of five. Actual labour is 3 × 24.00 + 8 × 22.00 = 248.00 and overhead 3 × 10.00 + 8 × 6.00 = 78.00, so the actual cost is 728.00. The ten benches go into stock as finished goods at the planned 683.00. The difference of 45.00 is an unfavourable cost variance, expensed when the production order is closed.

Planned and actual cost: standard cost and variance.

RTJ 4 point 14 allows the standard cost method if the result approximates actual cost. Standard costs take into account normal levels of materials and supplies, labour, efficiency and capacity utilisation. They must be reviewed regularly and, if necessary, revised in the light of current conditions.

The idea of standard cost is simple: finished goods enter stock at a known price as soon as they are made, and the difference between actual cost and standard is collected separately as a cost variance. An unfavourable variance, where actual cost is higher, is an expense; a favourable variance reduces expenses. If the variance is large and points the same way month after month, the standard no longer approximates actual cost. Then change the recipe quantities, standard times or hourly rates instead of carrying the variance from year to year.

The cause of a variance is almost always in one of three places:

  • materials: more was used than the recipe says, or the stock cost of a material changed after planning
  • time: a stage took longer than standard, or the standard time was wrong from the start
  • rates: the hourly rate or the overhead rate no longer reflects actual costs

Work in progress and production entries.

While work is under way, the materials and labour used are not yet a finished product. They are collected on the balance sheet account “Work in progress”. When the product is finished, its value moves to finished goods and, on sale, to cost of goods sold. Standard costing uses seven entries:

  • materials consumed: debit “Work in progress”, credit materials inventory at actual stock cost
  • time logged: debit “Work in progress”, credit “Labour absorbed into production cost”
  • overhead on the same hours: debit “Work in progress”, credit “Overhead absorbed into production cost”
  • finished goods into stock: debit “Finished goods”, credit “Work in progress” at standard cost
  • scrap: debit “Production scrap”, credit “Work in progress” at standard cost
  • closing the production order: the remaining work in progress balance goes to “Production cost variance”
  • sale: debit cost of goods sold, credit “Finished goods”; revenue and VAT come from the sales invoice

The credit account for labour and overhead is an income statement account, not a liability. Wages are already expensed in full by the payroll entries, and rent and energy by the purchase invoices. The time entry shows only the part moved into the cost of the product. Saldofy maps these accounts to the scheme 1 income statement line “Change in inventories of finished goods and work in progress”. The cost is therefore in the result once, and no closing entry is needed at month-end.

On the month-end balance sheet, work in progress is the cost collected so far on open production orders. If that balance keeps growing month after month while orders are not completed, check whether the work is really unfinished or the order was simply never closed.

Common mistakes in production cost.

Most mistakes come from the inputs, not the arithmetic. These are the most frequent:

  • all company costs, including office, sales and marketing, are spread over products, which RTJ 4 does not allow
  • the overhead rate is calculated from the actual hours of one quiet month and the product cost balloons
  • a production stage has no standard time or a standard time of 0, so planned labour and overhead stay at zero
  • a material has neither a stock cost nor a purchase price, so the costing counts it at zero
  • attendance time from a card reader is treated as time spent on the production order, although attendance and time on a particular stage are different things
  • the recipe is corrected after the production order was planned, on the assumption that the order changes with it
  • a cost variance is “fixed” by editing the finished goods price by hand instead of finding the cause
  • abnormal losses, such as a batch sawn to the wrong size, are left in the product's cost

How Saldofy calculates production cost.

The Saldofy manufacturing module performs the same calculation per production order and posts the entries to the general ledger as work progresses. The setup and workflow are as follows (menu names are from the English interface):

  • Manufacturing → Departments: each department has an hourly rate and an overhead rate per hour; a rate of 0 switches overhead off.
  • Manufacturing → Routings: the production stages in order, each with a department, a standard time in minutes per unit and a setup time.
  • Recipes: components, quantities, scrap percentage and sub-assemblies. In the recipe overview, a user with the cost permission sees the planned cost of one unit.
  • The production order button “Plan (reserve)” freezes the recipe and the production stages and calculates the estimated cost. The material price comes from stock cost, then from average cost and then from the purchase price. Materials without a cost are named in the production order's events.
  • “Consume material” moves materials from stock into work in progress at actual cost. With the consumption method “Automatic (backflush)”, Saldofy does this itself from the recipe when finished goods are received.
  • Time comes from the “Log time” button, the mobile app or a station, where the time between starting and finishing a stage is booked for each worker. The entry is dated on the day the work was done and uses the department's hourly rate at that moment.
  • “Receive output” brings finished goods into stock at standard cost, and “Record scrap” expenses the scrap.
  • “Complete” calculates the actual cost, posts the remainder to the cost variance and releases unused material reservations.

Accounts are linked under Settings → Account roles: “Work in progress”, “Finished goods”, “Production cost variance”, “Production scrap” and the accounts for labour and overhead absorbed into production cost. No entries are posted into a locked period. Cancelling a production order that is in progress returns materials to stock at the same cost and reverses the labour and overhead entries, so the history stays intact.

Cost and variances are a separate permission: a shop-floor worker sees the production order and logs time but does not see the company's costs. Under Manufacturing → Production reports, the monthly summary shows the quantity produced, standard and actual hours and material cost, and the cost itself for users with the cost permission.

What to agree with your accountant first.

The software calculates consistently, but the company chooses the basis. Before the first production order, agree on the following:

  • which formula values materials and finished goods: FIFO or weighted average
  • which costs go into the production overhead rate and what the normal number of production hours per year is
  • which accounts are used for work in progress, finished goods, scrap and cost variance
  • how often standard times, hourly rates and the overhead rate are reviewed
  • how inventories are checked at year-end: under RTJ 4 point 21, materials and work in progress are written down when the estimated cost of the finished products made from them exceeds their net realisable value

Sources and further reading

See the costing on one of your own products.

In a demo we enter one of your products' recipe, production stages and department rates into Saldofy and walk through the production order, the entries and the cost variance together.